Toledo Mining says second shipment of laterite ore left Berong port
March 9th, 2007
Filed under: Mineral - Nickel, Operator - Toledo Mining, Region 07 - Cebu
LONDON (AFX) - Toledo Mining Corp PLC said a second shipment of about 51,000 tonnes of laterite ore left the Berong port in the Philippines on March 2 and that the shipment, for the Chinese market, was loaded in under seven days.
The mining company said a third shipment of about 50,000 tonnes is expected to start loading around March 6 and a fourth shipment of same capacity is planned around March 20.
The company said about 100,000 tonnes of laterite ore is currently stockpiled at the coast for these shipments.
Leave a Reply
Please note that your comments will be subject to moderation by the PMEA Blog Administrator.