Mindoro Agata Project Drilling Intersects Thick, High-Grade Nickel Laterite

EDMONTON, ALBERTA

Mindoro Resources Ltd. (TSX VENTURE:MIO)(FRANKFURT:WKN 906167) announces progress on the infill drilling program at Agata Nickel Project.

A total of 52 holes for 940 meters (m) have been completed from a detailed infill drilling program totaling 2,500 to 3,000 meters. Results have been received for 322 core assays from the first 16 holes, drilled on 25m x 25m and 50m x 50m patterns. A full list of assay results is available with this release on Mindoro’s website at www.mindoro.com; the average grades and thicknesses of significant intercepts are as below:

Read More..

Leave a Reply

Please note that your comments will be subject to moderation by the PMEA Blog Administrator.